The most common mistake in a kitchen refit is replacing the units but leaving the old plumbing and wiring. Without enough sockets and circuits for the dishwasher, oven and hob, a new kitchen soon runs into problems.
At the survey we measure your kitchen, plan the appliance layout with you and work out the plumbing and electrical needs from the start. That way nothing has to be broken open after the units are fitted.
What does our Kitchen Renovation service include?
- Removal of old units and worktops
- Rerouting water, waste and electrical lines
- Made-to-measure base and wall units
- Worktop fitting
- Splashback tiling
- Sink, tap and built-in appliance fitting
- Under-cabinet lighting
How long does it take?
Usually 2–3 weeks including unit manufacture; fitting takes 2–4 days. We'll confirm the exact timescale in writing after the survey.
What affects the price of Kitchen Renovation?
- Kitchen size and layout (galley, L-shaped, U-shaped)
- Cabinet door material
- Worktop material
- Changes needed to plumbing and electrics
- Number of built-in appliances
Send us photos on WhatsApp and for most jobs we can give you an estimate without a visit. Surveys are free throughout Kusadasi.
Frequently asked questions
Is it possible to replace just the cabinet doors?
Yes. If the carcasses are sound, we can refresh your kitchen at a much lower cost by replacing only the doors and worktop.
How many days will I be without a kitchen?
Usually 3–5 days for strip-out, plumbing and fitting. Because the units are made in advance, this is kept short.