In a bathroom renovation, the tiles you see are only part of the job. What really matters is the plumbing and waterproofing inside the walls and floor. Laying new tiles over old pipework usually comes back within a few years as a leak into the flat below.
So after stripping out, we check the plumbing, renew it where needed, waterproof the wet areas and only then move on to tiling and fitting the sanitaryware.
What does our Bathroom Renovation service include?
- Removal of old tiles and sanitaryware
- New water supply and waste pipework
- Wet area waterproofing
- Wall and floor tiling
- Concealed cistern, toilet and basin fitting
- Shower enclosure or shower tray
- Bathroom cabinet, mirror and accessory fitting
How long does it take?
A standard bathroom usually takes 5–7 working days. We'll confirm the exact timescale in writing after the survey.
What affects the price of Bathroom Renovation?
- Bathroom floor area
- Whether the plumbing is fully renewed
- Tile and sanitaryware brands
- Extras such as a concealed cistern or shower enclosure
- Layout changes such as replacing a bath with a shower
Send us photos on WhatsApp and for most jobs we can give you an estimate without a visit. Surveys are free throughout Kusadasi.
Frequently asked questions
Can I stay at home during the bathroom renovation?
Yes, but you won't be able to use the bathroom for a few days. If there's no second bathroom, we plan the work to keep this as short as possible.
Can new tiles be laid over old ones?
Sometimes, but we don't recommend it. The plumbing and waterproofing can't be checked and the floor level rises. Stripping out first is better in the long run.
Water is leaking into the flat below. Does the whole bathroom need redoing?
Not always. We first find the source of the leak; sometimes just a trap, drain or grout repair is enough.